Description Hide Description- Show Description+
- Product description:
- Cubist Railings are the perfect way to add a touch of rustic industrial style to your deck. They are affordably priced and come with double powder-coating for extra protection. Plus, they're easy to install!
- How to buy by using our easy online purchasing system:
- Measure your deck sides from edge to edge and add them up to get the total linear feet of the deck.
- Please measure the length of the stairs from the deck edge to the last thread nosing and include them in the foot count.
- Make all your selections to get a price per foot:
- Choose the color, or upload the color code if you need a matching color.
- Choose the type of handrail.
- If you provide the wood handrail, choose "Perforated 1/4" X 2 Flat Bar To Add A Wood Top."
- Set up an account for better-automated communication. (We will not send you unwanted emails)
- Complete the shipping options
- Select your sales tax status.
- Upload the deck schematic so that we can send you shop drawings. You can also email them later to sales@deciron.com.
- Upload pictures from different angles, especially corners, transitions, and places where the deck touches the house.
- Enter the total linear feet, including stair railing and deck railings
- Place the order or get a quote emailed to you for future references.
- After you have completed your purchase, you will receive the shop drawings of each section and the overall layout, showing post positions and all dimensions.
- Once you have approved the drawings, we will proceed to manufacture your railings.
- The process takes eight weeks from purchase to delivery, including one week to produce shop drawings.
- The minimum order is 20 linear feet.
- You can convert your quote into a purchase at any time.
- Shipping is free to the closest FedEx location.
Warranty Information Hide Warranty- Show Warranty+
LIMITED LIFETIME WARRANTY
1-year warranty for the finish and lifetime for the integrity of the welds. Shipping Warranty is by FedEx insurance. Please note all damages at reception.